Upcoming BHAC Agenda

The Beacon Hill Architectural Commission will hold its monthly public hearing on Thursday, August 15 at 5:00 PM. This hearing will be held virtually only. Participate via Zoom or by calling 1 (929) 205-6099 and entering meeting ID # 966 1885 5342. Written comments or questions can be sent to [email protected]. The public can offer testimony.

Violation Review:

• APP # 25.0039 BH – 27 South Russell St: Ratification of unapproved door stain.

• APP # 25.0061 BH – 15 Temple St: Ratification of unapproved intercom system.

Design Review:

• APP # 24.1197 BH – 5 West Cedar St: Change paint color on bay window from black to off-white.

• APP # 24.1195 BH – 101 Chestnut St: Change window trim color to HC-176 Annapolis Gray.

• APP # 25.0095 BH – 160 Mount Vernon St: Install emergency electrical cut-off button.

• APP # 24.1187 BH – 18 Phillips St: Restore entry doors, windows, and alley door; replace concrete walks; add handrailing.

• APP # 24.0975 BH – 27 Chestnut St: Replace pointed arched windows.

• APP # 25.0090 BH – 54 Pinckney St: New roof deck.

Administrative Review:

• APP # 25.0010 BH – 37 Beacon St: Replace four 8-over-8 sash sets on 5th floor.

• APP # 25.0002 BH – 68 Beacon St: Replace seven basement sash sets on River St elevation.

• APP # 25.0003 BH – 81 Beacon St: Repoint front facade with matching mortar.

• APP # 25.0073 BH – 74 Chestnut St: Repoint chimney and facade.

• APP # 25.0047 BH – 13 Louisburg Sq: Install EV charging port.

• APP # 24.1186 BH – 15 Temple St: Repoint facade and restore front entrance.

• APP # 24.1199 BH – 15 Temple St: Replace deteriorated bolts, add J-bolts, secure supports, and repaint fire escape.

• APP # 25.0082 BH – 2 West Cedar St: Repoint front and rear facades and repair brickwork.

• APP # 24.1197 BH – 5 West Cedar St: Replace all extant storm windows.

• APP # 25.0021 BH – 22 West Cedar St: Repoint garden walls with matching mortar.

Other Business:

Ratification of July 18, 2024, public hearing minutes.

Annual vote for Chair and Vice Chair.

Staff updates.

For more information, visit the official Beacon Hill Architectural Commission page.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.